{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "Data collected in the field capturing limits of disturbance during construction or other activites.", "description": "
The limit of disturbance line may be used to collect data in the field regarding the Limit of Disturbance at construction sites, which may include the boundaries of silt and super silt fences, as well as the actual limits of disturbance to the soil and vegetation. This data may include approved limits of disturbance as well as unauthorized disturbance, which can include but is not limited to: grading, vegetation removal, fill, wetland fill, and tree removal.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "summary": "Data collected in the field capturing limits of disturbance during construction or other activites.", "title": "LOD", "tags": [ "Limit of Disturbance" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "", "licenseInfo": "", "portalUrl": "" }